01 NCAC 30F .0102          POLICY

It is the policy of the SBC to evaluate the work performed by prime contractors for capital improvement projects based on criteria contained herein. Further, it is considered of paramount importance that every state capital improvement project be constructed of a level of quality and adherence to a time schedule in keeping with the contract plans and specifications. It is to this end that individual prime contractor's performance on state capital improvement projects should be fairly and consistently evaluated and such evaluations used as a factor in determining qualifications of prime contractors to bid on future state capital improvement projects. If such evaluations lead to a determination that the level of performance by a contractor so warrants, the contractor may be disqualified from bidding on state capital improvement projects for a specified period of time.

 

History Note:        Authority G.S. 143‑135.26(4);

Eff. December 1, 1991;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. July 22, 2018.